Flash Furnace ancillary works contract
Ancillary works contract for the Chuquicamata Flash Furnace: ladle enclosures, fugitive gas system piping, copper launders, baghouse filters, electrically actuated valves and installation of the VTI and VTF units. About 250 people on double shifts.

In the Flash Furnace building, LTF carried out the enclosures for the ladles that receive the molten metal and installed the piping of the fugitive gas system, with its flap valves, to capture the gases that escape during transfer. The launders through which the copper flows to the ladles were also installed.
The contract included maintenance of the baghouse filters and the electrically actuated valves, and the installation and alignment of the VTI and VTF units. About 250 people took part in the job on a double-shift system.
Scope delivered.
What LTF delivered on this project, item by item. The photo follows each item as you scroll.
- 01
Work on the ladle enclosures
The ladles receive the molten metal. Their enclosures were built panel by panel, with scaffolding and a forklift in the building.
- 02
Installation of fugitive gas system piping with flap valves
The system captures the gases that escape during metal transfer, one of the works with which smelters respond to Supreme Decree No. 28 of 2013.
- 03
Installation of launders for copper flow to the ladles
The launders are the channels through which copper flows to the ladles.
- 04
Maintenance of baghouse filters and electrically actuated valves
Baghouse filters retain the dust in the gases. Their maintenance, along with that of the electrically actuated valves, was part of the ancillary works contract.
- 05
Installation and alignment of the VTI and VTF units
The VTI and VTF units were installed and left aligned in position, as part of the Flash Furnace ancillary works contract.
- 06
About 250 people on a double-shift system
LTF worked from its own site facilities on a double-shift system. The record includes the smelter at night and the facilities at dawn.
Project record.
Photos taken on site. Tap any image to see it in full, zoom in and browse all 13 from the project.
Chuquicamata smelter, Calama.
Site context
Since Supreme Decree No. 28 of 2013, Chilean copper smelters must capture and fix at least 95% of the sulfur and arsenic entering the process, a requirement in force since December 2018. Capturing the fugitive gases that escape in the furnace building is one of the works smelters carry out to comply with that standard.
LTF Montajes Industriales · +56 9 9431 6903 · [email protected] · ltfmontajes.cl
ZeCor-Z welding and acid plant maintenance
Codelco, Chuquicamata Division · Acid plant, Chuquicamata smelter, Calama View the sheet
Project index
12 project sheets for Codelco- 01 Boiler tube banks for the Chuquicamata smelter Chuquicamata smelter 2025
- 02 Crane maintenance and rail replacement at the Potrerillos smelter Potrerillos smelter 2025
- 03 Boiler banks, wall panels and boiler maintenance Smelter and thermoelectric plant 2020 and 2021
- 04 Flash Furnace cooling system Chuquicamata smelter 2023
- 05 Replacement of casting wheels 3 and 4 Chuquicamata smelter 2021 and 2023
- 06 Flash Furnace ancillary works contract Chuquicamata smelter This sheet
- 07 ZeCor-Z welding and acid plant maintenance Acid plant 2021
- 08 Fabrication and maintenance of dryer 6 coils Chuquicamata smelter 2024
- 09 Flash Furnace and boiler cooling, 18 inch line Chuquicamata smelter
- 10 Crane rail replacement at the Chuquicamata smelter Chuquicamata smelter 2021
- 11 Oxygen lines of 16, 20 and 24 inches Chuquicamata smelter 2020
- 12 Electrostatic precipitator maintenance Chuquicamata and Ministro Hales
Do you have a similar project at your plant?
Tell us the scope, the site and the schedule. We reply within one business day with a proposal.