Oxygen enriches the air that feeds the smelting and converting processes of the smelter. LTF fabricated and installed 16, 20 and 24 inch lines for its distribution, with surface preparation by white metal blasting, grade SSPC-SP5, and painting.
Installation included the system flowmeters and ended with its pneumatic tests. The job was carried out with 50 people, with a telescopic crane for lifting the sections, and was recorded in November 2020.
Scope delivered.
What LTF delivered on this project, item by item. The photo follows each item as you scroll.
- 01
Fabrication and installation of 16, 20 and 24 inch oxygen lines
Oxygen enriches the air that feeds the smelting and converting processes of the smelter. These lines distribute it.
- 02
Blasting and painting, grade SSPC-SP5
The surface was prepared by white metal blasting, grade SSPC-SP5, before painting.
- 03
Installation of flowmeters
The flowmeters measure the flow of oxygen through the system.
- 04
Pneumatic tests of the system
Installation ended with pneumatic tests of the complete system. - 05
Workforce of 50
The job had a telescopic crane for lifting the sections and was recorded in November 2020.
LTF Montajes Industriales · +56 9 9431 6903 · [email protected] · ltfmontajes.cl
Electrostatic precipitator maintenance
Codelco, Chuquicamata and Ministro Hales Divisions · Chuquicamata and Ministro Hales, Calama View the sheet
Project index
12 project sheets for Codelco- 01 Boiler tube banks for the Chuquicamata smelter Chuquicamata smelter 2025
- 02 Crane maintenance and rail replacement at the Potrerillos smelter Potrerillos smelter 2025
- 03 Boiler banks, wall panels and boiler maintenance Smelter and thermoelectric plant 2020 and 2021
- 04 Flash Furnace cooling system Chuquicamata smelter 2023
- 05 Replacement of casting wheels 3 and 4 Chuquicamata smelter 2021 and 2023
- 06 Flash Furnace ancillary works contract Chuquicamata smelter 2021
- 07 ZeCor-Z welding and acid plant maintenance Acid plant 2021
- 08 Fabrication and maintenance of dryer 6 coils Chuquicamata smelter 2024
- 09 Flash Furnace and boiler cooling, 18 inch line Chuquicamata smelter
- 10 Crane rail replacement at the Chuquicamata smelter Chuquicamata smelter 2021
- 11 Oxygen lines of 16, 20 and 24 inches Chuquicamata smelter This sheet
- 12 Electrostatic precipitator maintenance Chuquicamata and Ministro Hales
Do you have a similar project at your plant?
Tell us the scope, the site and the schedule. We reply within one business day with a proposal.