Crane rail replacement at the Chuquicamata smelter

Replacement of the crane rails in the Chuquicamata smelter building: electrical and mechanical lockout of the cranes, cutting and removal of the existing rails, and installation of the new ones with bracket welding. Workforce of 90.

The rails on which the building cranes travel carry the equipment that moves above the smelter. To replace them, LTF locked out the cranes in their electrical system and installed mechanical locks, so that none could move while the crew worked on the beam.

With the cranes secured, the existing rails were cut and removed and the new ones installed, with welding of their brackets. The work was done at height, on the building beams, with 90 people, and was recorded by drone in January 2021.

90
People on the job
Double lockout
Electrical and mechanical, on each crane
At height
On the building beams
Jan. 2021
Aerial record of the job

Scope delivered.

What LTF delivered on this project, item by item. The photo follows each item as you scroll.

  1. 01

    Electrical lockout of the cranes and installation of mechanical locks

    Each crane was given a double lockout, electrical and mechanical, so that none could move while the crew worked on the beam.
    Smelter building and runway beams
  2. 02

    Cutting and removal of rails

    With the cranes secured, the existing rails were cut and removed from the runway beams.
    Crane travel path over the building
  3. 03

    Installation of new rails with bracket welding

    The new rails were installed with the welding of their brackets, working at height on the building beams.
    Work at height on the rail
  4. 04

    Work carried out with 90 people

    The job was recorded by drone in January 2021.
    Crew in harnesses on the beam

Project record.

Photos taken on site. Tap any image to see it in full, zoom in and browse all 8 from the project.

Crew on the runway beam
04Crew on the runway beam
Rail replacement on the beam
06Rail replacement on the beam
Smelter equipment below the beam
08Smelter equipment below the beam