Flash Furnace cooling system

Fabrication and installation of the cooling circuits of the Chuquicamata Flash Furnace, with silver brazing, 316L stainless steel supply manifolds and 6, 8 and 10 inch lines. Workforce of 200 on rotating shifts.

The flash furnace works with water-cooled elements that protect its structure from the heat of the process. LTF fabricated and installed the circuits that feed those elements: dozens of copper lines, each with its own valve, connected to 316L stainless steel supply manifolds.

The circuit joints were made by silver brazing, and the 6, 8 and 10 inch supply systems were fabricated and installed in 316L stainless steel. Installation was completed with the furnace supply hoses, with a workforce of 200 on rotating shifts.

316L
Stainless steel for manifolds and lines
6, 8 and 10"
Diameters of the supply systems
Silver brazing
Joints of the copper circuits
200
People on rotating shifts

Scope delivered.

What LTF delivered on this project, item by item. The photo follows each item as you scroll.

  1. 01

    Fabrication and installation of the Flash Furnace cooling circuits

    The furnace works with water-cooled elements that protect its structure from the heat of the process. The circuits that feed them are dozens of copper lines, each with its own valve.
    Copper lines of the furnace circuits
  2. 02

    Silver brazing of the cooling system

    The joints of the copper lines in the circuits were made by silver brazing.
    Supply manifold with its branches
  3. 03

    Fabrication and installation of 316L steel supply manifolds

    The 316L stainless steel manifolds distribute the water to the circuits: each copper line connects to them through its own valve.
    Manifold No. 13 with its valves
  4. 04

    Fabrication and installation of 6, 8 and 10 inch supply systems in 316L stainless steel

    The 6, 8 and 10 inch supply lines were fabricated and installed in the same 316L stainless steel as the manifolds.
    Circuits connected to the manifold
  5. 05

    Installation of the Flash Furnace supply hoses

    The furnace supply hoses completed the installation of the system.
    Valves and circuits on the manifold
  6. 06

    Workforce of 200 on rotating shifts

    The work took place in the Flash Furnace building, the heart of the Chuquicamata smelter, with 200 people on rotating shifts.
    Section of the manifold in the furnace building

Project record.

Photos taken on site. Tap any image to see it in full, zoom in and browse all 15 from the project.

Flange of the stainless steel manifold
05Flange of the stainless steel manifold
Run of manifolds in the furnace building
08Run of manifolds in the furnace building
Manifold with its valves and circuits
12Manifold with its valves and circuits
Copper lines and manifold, low angle
15Copper lines and manifold, low angle

Chuquicamata smelter, Calama.

Site context

The Flash Furnace is the heart of the Chuquicamata smelter, Codelco’s largest: around the middle of the last decade it had a smelting capacity of 1.4 million tonnes per year, with one flash furnace, two Teniente converters and three Peirce-Smith converters. Its cooling systems keep the elements surrounding the molten bath within their temperature range.