Boiler banks, wall panels and boiler maintenance

Fabrication of convection and radiant banks, wall panels and bends for the boilers of the Chuquicamata Division, with their installation, steam drum maintenance, and hydrostatic tests and non-destructive testing of every system. Workforce of 200.

LTF fabricated the convection and radiant banks and the boiler wall panels, together with the cold and hot bends that form the serpentine coils. At the shop, each bank is assembled tube by tube on its frame before traveling to site.

On site, the headers and nozzles of the radiant and convection zones were installed, and the steam drum was serviced, with replacement of the demister that separates water droplets from the steam and replacement of the relief valves. Each system was closed out with a hydrostatic test and non-destructive testing: radiography, magnetic particle, liquid penetrant and visual inspection. The job brought together 200 people.

200
People on the job
RT · MT · PT · VT
Non-destructive testing on every system
Convection and radiant
Banks fabricated at the shop
Hydrostatic test
On every system delivered

Scope delivered.

What LTF delivered on this project, item by item. The photo follows each item as you scroll.

  1. 01

    Fabrication of convection and radiant banks

    At the shop, each bank is assembled tube by tube on its frame before traveling to site.
    Tube welding at the shop
  2. 02

    Fabrication of wall panels

    Together with the banks, the tube panels carry out the exchange through which the boiler recovers heat from the metallurgical gases of the process.
    Assembly of a bank on its frame
  3. 03

    Fabrication of cold and hot bends

    The cold and hot bends are what form the serpentine coils.
    Crew inside the boiler
  4. 04

    Installation of headers and nozzles in the radiant and convection zones

    On site, with crews working inside the boiler, the headers and nozzles of the radiant and convection zones were installed.
    Work inside the boiler
  5. 05

    Steam drum maintenance and demister replacement

    The demister is the steam drum component that separates water droplets from the steam. It was replaced as part of the drum maintenance.
    Welder on scaffolding inside the boiler
  6. 06

    Relief valve replacement

    Relief valves protect the boiler against overpressure. They were replaced together with the steam drum maintenance.
    Loading equipment at the LTF shop, Concón (October 2025)
  7. 07

    Hydrostatic tests and non-destructive testing (RT, MT, PT, VT) on every system

    Each system was closed out with a hydrostatic test and with radiography, magnetic particle, liquid penetrant and visual inspection: a tube that fails in service stops the equipment.
    Crane dispatch from the LTF shop, Concón (November 2025)
  8. 08

    Workforce of 200

    The whole job, from shop fabrication to the testing of each system, brought together 200 people.
    Detail of the tube welds

Project record.

Photos taken on site. Tap any image to see it in full, zoom in and browse all 14 from the project.

Crew on the boiler tube panels
14Crew on the boiler tube panels

Smelter and thermoelectric plant, Chuquicamata. Fabricated at the LTF shop.

Site context

The Chuquicamata Flash Furnace boiler recovers heat from the process off-gases, and its tube banks and panels are what make that heat exchange happen. Since 2020 the smelter recorded an increase in tube rupture failures in that boiler, and in the major maintenance shutdown of November 2022, lasting 135 days, about 50% of its heat exchange surface was replaced, as reported by Diario Financiero.

The smelter boiler area recovers all the water it uses in its processes, as reported by Codelco in 2019. That is why every bank, panel and header is delivered with its hydrostatic test and non-destructive testing: a tube that fails in service stops the equipment.