Boiler tube bank fabrication.

Convection and radiant banks, wall panels and boiler bank No. 6: fabricated tube by tube in the shop, certified and dispatched to the boiler of the Chuquicamata smelter.

Processes and equipment

A new tube bank extends the service life of the boiler. That is why every serpentine coil is fabricated to drawings and every bank leaves the shop certified.

Review of the bank model

Tube banks are the heart of a boiler’s heat exchange. In the Chuquicamata Flash Furnace boiler, which recovers heat from the metallurgical off-gases, the smelter recorded an increase in tube rupture failures from 2020 onwards, and in the major shutdown of November 2022 about 50% of its heat exchange surface was replaced, as reported by Diario Financiero.

For the Chuquicamata Division, LTF fabricated convection and radiant banks, wall panels and cold and hot bends in 2020 and 2021, and in 2025 the banks of the convection section of the smelter boiler, with ASTM A192 tubes. Boiler bank No. 6, weighing about 13 tonnes and with more than 1,000 welded joints, was dispatched under escort from the Concón shop.

Service: Mechanical works

What we deliver.

Every point comes from a real LTF project: each project sheet is linked below.

Verified material

A192 boiler tubes and inlet and outlet headers inspected against the purchase order and the technical specification before release.

Coil by coil

Cutting, sizing, jig layout and welding to drawings; each bank is assembled tube by tube on its frame.

Tests and certification

Hydrostatic test and non-destructive testing (RT, MT, PT, VT) on the boiler systems, and quality certification before dispatch.

13t
Weight of boiler bank No. 6
+1,000
Welded joints in a single bank
200
People on the 2020 and 2021 banks and panels project
A192
ASTM standard of the boiler tubes

Frequently asked questions.

Answers based on the published projects. For your case, write to us: we reply within one business day.

Request a proposal →
What types of boiler banks does LTF fabricate?

Convection and radiant banks, wall panels and the cold and hot bends that form the serpentine coils, as well as the banks of the convection section of the Chuquicamata smelter boiler.

Which tubes are used?

For the 2025 banks for Chuquicamata, ASTM A192 tubes: the standard for seamless carbon steel tubes for boilers and superheaters in high-pressure service.

How is a bank tested before going into service?

On the 2020 and 2021 banks and panels project, each system was closed out with a hydrostatic test and non-destructive testing: radiography, magnetic particle, liquid penetrant and visual inspection. Boiler bank No. 6 passed all quality certifications before dispatch.

Related solutions

Services

Processes and equipment

The plant equipment and systems LTF has fabricated, installed and maintained.

All solutions
Contact

Let’s talk about your next project.

Tell us the scope, the site and the schedule. We reply within one business day with a proposal.

WhatsApp