Fabrication and maintenance of dryer 6 coils
Fabrication of five coil sections in super duplex steel for dryer 6 of the Chuquicamata smelter, with their installation, repair of the dryer shell, and replacement of the piping and electrically actuated valves. Workforce of 140 on rotating shifts.

The dryer is a rotating drum with heated tube bundles inside, the coils, which remove moisture from the concentrate before smelting. LTF fabricated five new coil sections in super duplex steel, between China and its Calama shop, including the welding, bending and drilling of the matrices.
On site, the existing sections were removed and the new ones installed, the dryer shell was repaired with plates and welding, and the piping system and electrically actuated valves were replaced. 140 people took part on a rotating shift system.
Scope delivered.
What LTF delivered on this project, item by item. The photo follows each item as you scroll.
- 01
Fabrication of 5 dryer coil sections in super duplex steel, between China and the Calama shop
The coils are the heated tube bundles that, inside the dryer’s rotating drum, remove moisture from the concentrate before smelting.
- 02
Super duplex welding, bending and drilling of matrices
Fabrication of each section included the super duplex welding, the bending and the drilling of the matrices.
- 03
Removal of the old sections and installation of the new ones
On site, the existing sections were removed and the new ones installed through the dryer mouth, with the sections lifted into place.
- 04
Repair of the dryer shell with plates and welding
The shell is the outer casing of the dryer’s rotating drum. It was repaired with plates and welding, including work inside it.
- 05
Replacement of the piping system and electrically actuated valves
Besides the coils, the dryer’s piping system was replaced along with its electrically actuated valves.
- 06
Workforce of 140 on a rotating shift system
140 people took part on a rotating shift system, with crews at the mouth and inside the dryer.
Project record.
Photos taken on site. Tap any image to see it in full, zoom in and browse all 10 from the project.
LTF Montajes Industriales · +56 9 9431 6903 · [email protected] · ltfmontajes.cl
Flash Furnace and boiler cooling, 18 inch line
Codelco, Chuquicamata Division · Chuquicamata smelter, Calama View the sheet
Project index
12 project sheets for Codelco- 01 Boiler tube banks for the Chuquicamata smelter Chuquicamata smelter 2025
- 02 Crane maintenance and rail replacement at the Potrerillos smelter Potrerillos smelter 2025
- 03 Boiler banks, wall panels and boiler maintenance Smelter and thermoelectric plant 2020 and 2021
- 04 Flash Furnace cooling system Chuquicamata smelter 2023
- 05 Replacement of casting wheels 3 and 4 Chuquicamata smelter 2021 and 2023
- 06 Flash Furnace ancillary works contract Chuquicamata smelter 2021
- 07 ZeCor-Z welding and acid plant maintenance Acid plant 2021
- 08 Fabrication and maintenance of dryer 6 coils Chuquicamata smelter This sheet
- 09 Flash Furnace and boiler cooling, 18 inch line Chuquicamata smelter
- 10 Crane rail replacement at the Chuquicamata smelter Chuquicamata smelter 2021
- 11 Oxygen lines of 16, 20 and 24 inches Chuquicamata smelter 2020
- 12 Electrostatic precipitator maintenance Chuquicamata and Ministro Hales
Do you have a similar project at your plant?
Tell us the scope, the site and the schedule. We reply within one business day with a proposal.