316L stainless steel piping.

Supply manifolds and 6, 8 and 10 inch systems in 316L stainless steel, fabricated and installed for the cooling of the Chuquicamata Flash Furnace.

Standards and techniques

316L steel manifolds that deliver water to every furnace circuit. With 6, 8 and 10 inch supply systems.

Flange of the stainless steel manifold

316L is an austenitic stainless steel with molybdenum and low carbon content. Molybdenum improves its corrosion resistance and the low carbon reduces carbide precipitation during welding, which is why it is used in welded lines and equipment carrying water and process fluids.

For the cooling system of the Chuquicamata Flash Furnace, LTF fabricated and installed the supply manifolds in 316L steel and the 6, 8 and 10 inch supply systems in 316L stainless steel, with the copper circuits connected to each manifold. The job was carried out in 2023, with 200 people on rotating shifts.

Service: Piping

What we deliver.

Every point comes from a real LTF project: each project sheet is linked below.

Manifolds

Fabrication and installation of 316L steel supply manifolds, with their flanges and branches.

6, 8 and 10" systems

Supply lines in 316L stainless steel in three diameters.

Circuit connections

Copper circuits, each with its own valve, connected to the manifolds.

316L
Austenitic stainless steel with molybdenum
6, 8 and 10"
Diameters of the supply systems
200
People on rotating shifts
2023
Year of the project

Frequently asked questions.

Answers based on the published projects. For your case, write to us: we reply within one business day.

Request a proposal →
What is 316L steel?

An austenitic stainless steel with molybdenum and low carbon content, which improves corrosion resistance and reduces carbide precipitation during welding.

What did LTF fabricate in 316L?

The supply manifolds and the 6, 8 and 10 inch systems of the Chuquicamata Flash Furnace cooling system.

How many people worked on the project?

200 people on rotating shifts.

Related solutions

Services

Standards and techniques

Materials, welding, tests and inspections applied on the projects.

All solutions