Cranes and rails in smelter buildings.

PH crane maintenance and rail replacement at two Codelco smelters: Chuquicamata, with 90 people, and Potrerillos, with 75 workers.

Processes and equipment

No crane moves while the crew is working on the beam. Electrical lockout and mechanical locks before the first rail is cut.

Rail replacement on the beam

The rails on which the cranes of a smelter building travel carry the equipment that moves above the process. Replacing them means working at height, on the runway beams, with the cranes secured.

At the Chuquicamata smelter, LTF locked out the cranes in their electrical system and installed mechanical locks, cut and removed the existing rails and installed the new ones with bracket welding, with 90 people, in 2021. At the Potrerillos smelter it carried out maintenance of the PH cranes in the building, rail replacement, and fabrication and erection of structures, with 75 workers, in 2025.

Service: Mechanical works

What we deliver.

Every point comes from a real LTF project: each project sheet is linked below.

Lockout

Electrical lockout of each crane and installation of mechanical locks before working on the beam.

Rail replacement

Cutting and removal of the existing rails and installation of the new ones with bracket welding.

PH cranes

Maintenance of the cranes that travel along the smelter building, together with structures fabricated and erected for the plant.

2
Smelters: Chuquicamata and Potrerillos
90
People on the Chuquicamata rail replacement
75
Workers at Potrerillos
Double lockout
Electrical and mechanical, on each crane

Frequently asked questions.

Answers based on the published projects. For your case, write to us: we reply within one business day.

Request a proposal →
How is a rail replaced with no risk of the crane moving?

On the Chuquicamata project, each crane was locked out in its electrical system and mechanical locks were also installed, so that none could move while the crew worked on the beam.

At which smelters has LTF replaced rails?

At the Chuquicamata smelter, with 90 people, and at the Potrerillos smelter, where it also carried out maintenance of the PH cranes, with 75 workers.

How are the new rails fixed?

At Chuquicamata, the new rails were installed with bracket welding on the building beams.

Related solutions

Services

Processes and equipment

The plant equipment and systems LTF has fabricated, installed and maintained.

All solutions
Contact

Let’s talk about your next project.

Tell us the scope, the site and the schedule. We reply within one business day with a proposal.

WhatsApp