Oxygen lines of 16, 20 and 24 inches.

Fabrication and installation of the oxygen distribution lines of the Chuquicamata smelter, with white metal blasting, flowmeters and a pneumatic test of the system.

Processes and equipment

Oxygen enriches the smelting air and travels through lines of up to 24 inches. Fabricated, blasted, painted, installed and tested for the Chuquicamata smelter.

Industrial oxygen lines

Oxygen enriches the air that feeds the smelting and converting processes of the smelter. For its distribution, LTF fabricated and installed 16, 20 and 24 inch lines at the Chuquicamata smelter.

The surface of the lines was prepared by white metal blasting, grade SSPC-SP5, before painting. Installation included the system flowmeters and ended with its pneumatic tests. The job was carried out with 50 people, with a telescopic crane for lifting the sections, and was recorded in November 2020.

Service: Piping

What we deliver.

Every point comes from a real LTF project: each project sheet is linked below.

Fabrication and installation

16, 20 and 24 inch lines, lifted section by section with a telescopic crane and installed at height on the structure.

Surface

White metal blasting, grade SSPC-SP5, and painting of the lines.

Instrumentation and test

Installation of flowmeters and pneumatic tests of the complete system.

24"
Largest line diameter
3
Diameters: 16, 20 and 24 inches
50
People on the job
SSPC-SP5
White metal blast cleaning

Frequently asked questions.

Answers based on the published projects. For your case, write to us: we reply within one business day.

Request a proposal →
What is oxygen used for at a smelter?

It enriches the air that feeds the smelting and converting processes.

How was the surface of the lines prepared?

By white metal blasting, grade SSPC-SP5, before painting.

How was the system tested?

With pneumatic tests of the complete system, after the installation of the lines and the flowmeters.

Related solutions

Services

Processes and equipment

The plant equipment and systems LTF has fabricated, installed and maintained.

All solutions
Contact

Let’s talk about your next project.

Tell us the scope, the site and the schedule. We reply within one business day with a proposal.

WhatsApp