Installation of copper anode casting wheels.

Casting wheels 3 and 4 of the Chuquicamata smelter, fully dismantled and installed, with their hydraulic system, commissioning and calibration.

Processes and equipment

The casting wheel is the last step of the smelter. LTF dismantled wheels 3 and 4 and installed all their new components. With 150 workers on double shifts.

Anode casting wheels

The casting wheel is the circular structure where liquid copper solidifies in molds to form anodes. It is divided into three zones, casting, cooling and anode take-off, and the anodes it produces are essential for making cathodes in the electrolytic refinery.

At the Chuquicamata smelter, LTF fully dismantled casting wheels 3 and 4, with their spokes, rollers, racks, motors, gearboxes, cooling systems, take-off and weighing scales, and installed all the new components. It then installed the hydraulic system, cleaned it by flushing and carried out commissioning and calibration, with 150 workers on double shifts. The project dates from 2021 and 2023.

Service: Mechanical works

What we deliver.

Every point comes from a real LTF project: each project sheet is linked below.

Complete dismantling

Spokes, rollers, racks, motor, gearboxes, cooling systems, take-off and weighing scales of wheels 3 and 4.

Installation and hydraulics

Installation of all the new components and the hydraulic system, with flushing before operation.

Commissioning

Commissioning and calibration of the components, with survey control during the work.

2
Casting wheels, number 3 and number 4
150
Workers on double shifts
3
Wheel zones: casting, cooling and take-off
Flushing
Cleaning of the hydraulic system

Frequently asked questions.

Answers based on the published projects. For your case, write to us: we reply within one business day.

Request a proposal →
What is a casting wheel?

The circular structure at the smelter where liquid copper solidifies in molds to form anodes. It has casting, cooling and anode take-off zones.

What did the replacement of wheels 3 and 4 include?

Dismantling of the spokes, rollers, racks, motor, gearboxes, cooling systems, take-off and weighing scales; installation of all the new components; the hydraulic system with flushing; and commissioning and calibration.

How many people took part?

150 workers on a double-shift system.

Related solutions

Services

Processes and equipment

The plant equipment and systems LTF has fabricated, installed and maintained.

All solutions
Contact

Let’s talk about your next project.

Tell us the scope, the site and the schedule. We reply within one business day with a proposal.

WhatsApp